EV Chargers · Home & Workplace

EV charging, installed right. Smithton & beyond.

From a simple 7kW wall charger to load-managed 22kW three-phase setups, we install every major brand, and we install them properly. No melted plugs, no nuisance trips.

From $1,290 7kW single-phase · supply & install

5.0 · 14 ReviewsReplies in 5 minutesLicensed & Insured

Not sure if 7kW is enough? Call and talk it through.

Illustrative: Electripol electrician explaining a newly installed wall charger to a smiling homeowner beside her plugged in electric car
Google & Facebook
Installed our dimmer lights, smoke alarms and updated our switchboard. Great crew, professional, polite and fair on price.

Becky

Smithton, TAS

Google & Facebook
Jeremy and his team went above and beyond, switched our heating to a cheaper tariff, timed our hot water, and recommended a heat pump that cut our heating costs by 30%. Family-first, energy-smart, and genuinely local.

Brenton Crosland

Smithton, TAS

Licensed & insured

AS/NZ compliant

Smithton based

Family run

5.0 from 14 reviews

Google & Facebook

Replies in 5 minutes

Call or text

Quote in 2 business hours

Fixed price

Before you ring around

The EV charger worries we hear before every install.

“Will I need a new switchboard for a charger?”

Often no. Load management keeps charging within your mains capacity, and we check before quoting.

“I want to charge the car from my solar.”

We fit a solar aware charger that only charges from your excess PV.

“Is 7kW enough, or do I need 22kW?”

For overnight home charging, 7kW is plenty. 22kW only matters with three phase power and fast top ups.

“I've heard about melted plugs and nuisance trips.”

An RCD protected circuit with properly sized cable, signed off to AS/NZ 3000 and 3004.x.

“The charger has to go on an outside wall.”

Weatherproof outdoor mounting and tidy cable runs.

“Who sorts the warranty and the paperwork?”

We handle the compliance certificate and the brand registration.

Brands we install and service

Sigenergy logoSigenergy
AIKO logoAIKO
Schneider Electric logoSchneider Electric
How it goes

From switchboard check to first test charge.

Five steps, one local crew, and most home installs take 3 to 5 hours.

  1. Illustrative: Electripol electrician pointing out the main switch in an outdoor switchboard to a smiling homeowner, with the carport behind
    Step 01 · Board, mains and parking
    Step 1 · Site check

    EV charger site check: board, mains and parking.

    We look at your switchboard, mains capacity and where you park before recommending a charger.

    • Switchboard check
    • Mains capacity
    • Parking spot
    • Load management avoids a switchboard upgrade where possible, so we check this before quoting.
    • Cable runs over 15m, drilling through brick or block, or running underground change the job, so we look at the run on site.
  2. Illustrative: Electripol electrician holding a wall charger against the garage wall while chatting with a homeowner holding a mug of tea
    Step 02 · 7kW or 22kW
    Step 2 · Charger

    7kW or 22kW: the EV charger for your car.

    We pick the unit that fits your car, your house and your solar, not the one with the biggest margin.

    • 7kW for overnight
    • 22kW on three phase
    • Solar aware
    • For most overnight home charging, 7kW is plenty. It adds about 45km an hour.
    • 22kW only matters if you have three phase power and your car accepts AC fast charging.
    • A solar aware charger can be set to only charge from your excess PV.
    • Tesla, Ocular, Wallbox, Fronius and Zappi are all supported.
  3. Illustrative: Electripol electrician fixing conduit along a brick wall from the switchboard toward the carport, grinning at someone nearby
    Step 03 · Dedicated circuit
    Step 3 · Circuit

    A dedicated EV charger circuit from your switchboard.

    A dedicated RCD protected circuit, with cable sized for the run length, from your board to where the charger goes.

    • RCD protected
    • Cable sized for the run
    • Load management
    • Load management keeps charging within your mains capacity.
    • Wired to meet AS/NZ 3000 and 3004.x.
  4. Illustrative: Electripol electrician levelling a weatherproof EV charger on a carport wall while chatting with a farmer
    Step 04 · Mount the charger
    Step 4 · Mount

    The EV charger mounted where you park.

    Weatherproof outdoor mounting and tidy cable runs, so the charger handles the weather and looks neat.

    • Weatherproof mount
    • Tidy cable runs
    • Beside your parking spot
    • Most home installs take 3 to 5 hours.
    • Three phase or long cable runs can stretch to a full day.
  5. Illustrative: Electripol electrician showing a laughing homeowner the charging app beside her plugged in electric car
    Step 05 · App and test charge
    Step 5 · Handover

    EV charger app set up and a test charge with you.

    We set up the app, run a test charge with you on site, and you're away.

    • App set up
    • Test charge on site
    • Compliance certificate
    • Compliance certificate and brand registration handled.
    • Brand registration activates your charger warranty.
What locals say

The crew behind your EV charger install.

5.0
14 reviews on Google & Facebook
Jeremy and the team did a fantastic job installing down lights, all new power points and light switches, plus a few extras. His recommendation for down lights was spot on, take his advice.
Jane HornsbyCircular Head, TAS · May 2025

1 / 4

What you get

What goes into every EV charger install.

Tesla, Ocular, Wallbox, Fronius and Zappi supported

So you get the charger that suits your car.

Single and three phase, up to 22kW

So the charger matches the power you have.

Load management

So you avoid a switchboard upgrade where possible.

Solar aware charging

So the car only charges from your excess PV.

Weatherproof outdoor mounting, tidy cable runs

So it handles the weather and looks neat.

Compliance certificate and brand registration

So the job is signed off and the warranty is active.

Often no, modern chargers support load management, which throttles charging to stay within your mains capacity. We'll check before quoting.

Yes. Most modern chargers (Ocular, Zappi, Fronius Wattpilot) can be set to only charge from excess solar, free fuel from your roof.

For most overnight home charging, 7kW is plenty (adds ~45km/hr). 22kW only matters if you have three-phase power and need fast top-ups.

Most home installs are 3-5 hours. Three-phase or long cable runs can stretch to a full day.

Get a quote

Book an EV charger install.

Hi, I'm Jeremy.

We're not the biggest sparkies in Tassie.We just want to be the ones you trust enough to ring twice.
5.0 · 14 ReviewsReplies in 5 minutesLicensed & Insured
  • Fixed price quotes

  • On time or we call

  • Tidy site every time

Request a quoteor call 0418 182 724

Quotes back within 2 business hours.

We reply within 2 business hours

What happens next

  1. 1.We reply within 2 business hours.
  2. 2.We check your switchboard, mains and parking spot.
  3. 3.You get a fixed price quote in writing.

Prefer to talk? Call 0418 182 724