New builds · Renovations · Owner-builders

New home wiring, done once. Done right.

Full electrical rough-in and fit-off for new builds and major renovations across North West Tasmania. Every home wired battery-ready, EV-ready and future-proofed, because tearing walls open twice is nobody's idea of fun.

5.0 · 14 ReviewsReplies in 5 minutesLicensed & Insured

Not sure when to bring us in? Call and talk it through.

Illustrative: Electripol electrician in the open timber frame of a new home, explaining the cable runs to a smiling young couple
Google & Facebook
Jeremy and the team did a fantastic job installing down lights, all new power points and light switches, plus a few extras. His recommendation for down lights was spot on, take his advice.

Jane Hornsby

Circular Head, TAS

Google & Facebook
Installed our dimmer lights, smoke alarms and updated our switchboard. Great crew, professional, polite and fair on price.

Becky

Smithton, TAS

Licensed & insured

AS/NZ compliant

Smithton based

Family run

5.0 from 14 reviews

Google & Facebook

Replies in 5 minutes

Call or text

Quote in 2 business hours

Fixed price

Before you ring around

The new home wiring worries we hear most.

“We're about to pour the slab. Is it too late?”

Bring us in before the pour, so underslab conduits go in now and aren't retrofitted later.

“We'll want solar and an EV down the track.”

Every home we wire is battery ready and EV ready, with spare conduits to the garage.

“The plans just show a grid of downlights.”

We do proper lighting design, planned around how you use each room.

“I'm an owner builder and the paperwork worries me.”

Plan review, staged rough-in, fit-off and all the paperwork, so your inspection passes first time.

“Will you work with our builder?”

Yes. We coordinate with your builder, drafter and other trades, and come to site meetings.

“Data and TV points always end up in the wrong spot.”

Cat6 data, TV points and outdoor power marked up where you'll actually use them.

Brands we install and service

Sigenergy logoSigenergy
AIKO logoAIKO
Schneider Electric logoSchneider Electric
How it goes

From marked up plans to new home handover.

Five stages, scheduled around your builder's program. Rough-in is typically 2 to 4 days, fit-off usually 1 to 2.

  1. Illustrative: Electripol electrician marking up a floor plan on a new home slab while chatting with the builder and the owner
    Step 01 · Plan review
    Step 1 · Plan

    New home plans, marked up before rough-in.

    We sit down with your plans, ask the questions your builder didn't, and mark up power, data and lighting where you'll actually use them.

    • Power, data and lighting
    • Lighting design
    • Works with your builder
    • Proper lighting design, planned around how you use each room, not just a downlight grid.
    • Cat6 data, TV points and outdoor power planned around your landscape.
    • We're happy to attend site meetings and review plans with your builder or drafter.
  2. Illustrative: Electripol electrician tying grey conduits to the slab mesh and chatting with the builder before the pour
    Step 02 · Before the pour
    Step 2 · Underslab

    New home conduits laid before the slab is poured.

    Bring us in before the pour, so underslab conduits, data runs, EV ready wiring and solar cabling are planned in, not retrofitted later.

    • Underslab conduits
    • Before the pour
    • Spare conduits to the garage
    • Retrofitting later can cost 3 times as much.
    • Spare conduits to the garage leave room for a battery or EV charger down the track.
  3. Illustrative: Electripol electrician pulling cable through the open wall frames of a new home while chatting with the owner
    Step 03 · Rough-in
    Step 3 · Rough-in

    New home rough-in, cabled through the open frames.

    Cables run through the wall frames and ceilings before the plaster goes on. Tidy work you'd be happy to leave exposed.

    • Before plaster
    • Battery and EV ready
    • Cat6 data cabled in
    • Rough-in is typically 2 to 4 days, depending on home size.
    • Battery ready and EV ready wiring goes in by default.
    • Structured Cat6 data, TV points and smart switching are cabled in now, so nobody cuts into finished walls later.
  4. Illustrative: Electripol electrician fitting a power point in a new kitchen and chatting with the smiling home owner
    Step 04 · Fit-off
    Step 4 · Fit-off

    New home fit-off, after the painters and cabinetmakers.

    Switches, GPOs, lights, smoke alarms and switchboard commissioned after paint and cabinetry, every circuit tested.

    • After paint and cabinetry
    • Every circuit tested
    • Switchboard commissioned
    • Final fit-off is usually 1 to 2 days.
    • A compliant switchboard sized for solar and future load.
  5. Illustrative: Electripol electrician showing a smiling young couple the light switches in their new home at handover
    Step 05 · Compliance & handover
    Step 5 · Handover

    New home handover: certified and walked through.

    Certificate of Electrical Compliance, meter application, and a walkthrough so you know what every switch does.

    • Compliance certificate
    • Meter application
    • Switch walkthrough
    • Certificates of Electrical Compliance issued direct to the builder or owner builder.
    • For owner builders, we handle the paperwork so your inspection passes first time.
What locals say

Read the reviews before you build.

5.0
14 reviews on Google & Facebook
Jeremy and his team went above and beyond, switched our heating to a cheaper tariff, timed our hot water, and recommended a heat pump that cut our heating costs by 30%. Family-first, energy-smart, and genuinely local.
Brenton CroslandSmithton, TAS · Jun 2025

1 / 4

What you get

What every new home wiring job comes with.

Plan review with your builder or drafter before rough-in

So power, data and lights land where you'll use them.

Battery ready and EV ready wiring by default

So adding a battery or charger later is not a rewire.

Proper lighting design, not just a downlight grid

So each room is lit for how you use it.

Structured Cat6 data, TV and smart switching planned in

So nobody is cutting into finished walls later.

Compliant switchboard sized for solar and future load

So what's coming next has room on the board.

Certificates of Electrical Compliance issued at handover

So the job is signed off and your inspection passes.

As early as possible, ideally before the slab is poured. Early involvement means underslab conduits, data runs, EV-ready wiring and solar cabling are planned in, not retrofitted later at 3x the cost.

Yes, we coordinate with your builder, drafter and other trades. We're happy to attend site meetings, review plans, and issue Certificates of Electrical Compliance direct to the builder or owner-builder.

Absolutely. We take the electrical stress off owner-builders, plan review, staged rough-in, final fit-off and all the paperwork so your inspection passes first time.

Every new home we wire is battery-ready and EV-ready by default, spare conduits to the garage, a switchboard sized for what's coming, and data drops where you'll actually use them.

We do proper lighting design (not just downlights every 1.5m), structured Cat6 data, TV points, smart switching options and outdoor power planned around your landscape, not as an afterthought.

Get a quote

Get your new build wired properly.

Hi, I'm Jeremy.

We're not the biggest sparkies in Tassie.We just want to be the ones you trust enough to ring twice.
5.0 · 14 ReviewsReplies in 5 minutesLicensed & Insured
  • Fixed price quotes

  • On time or we call

  • Tidy site every time

Request a quoteor call 0418 182 724

Quotes back within 2 business hours.

We reply within 2 business hours

What happens next

  1. 1.We reply within 2 business hours.
  2. 2.We review your plans with you or your builder.
  3. 3.You get a clear quote in writing.

Prefer to talk? Call 0418 182 724